1. It is prohibited to stay, examine or clean pit under the hopper when hopper is lifting. If you must work under the hopper, you should lift the hopper above the orbital groove DMP planetary mixer manufacturer, hang up the hopper hook and cut off the electricity. When cleaning up the accumulated material concrete batching plant, you should wait until that the hopper descends to the bottom of pit and the power is off. The workers must not stand on the horizontal steel of the charging frame when they clean up the workbench on the hopper.
Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:concrete batching machine,mobile concrete batching plant,portable diesel cement mixer,etc. We will provide you with the best product and service.
2. Be careful with the electricity. It is necessary to avoid getting damp and
prevent the electricity components and wires being damaged.
3. It is forbidden to add aggregate to orbital groove when feeding material
which can avoid damaging the hopper and frame.
4. When lifting the hopper filled with materials, if the materials can not
pour into the mixing drum in time diesel engine concrete mixer, you should
descend the hopper into the pit and it is wrong to make the hopper remain in the
air for a long time.
